The western red cedar shade batten panels are designed to be removeable for maintenance
The shade structure floats between the existing church hall and the new indoor / outdoor lunch room building that CplusC completed in early
Detail showing a successful alternative to unsighly shade sail structures
Topping off extensive renovations at the Paddington Childrens Centre by CplusC in early 2011 we have designed and built a lightweight shade structure to increase the overall available outdoor shaded areas for the children. The original works involved a $500k+ extension to the heritrage listed building and new sythetic turf and soft fall play areas throughout the grounds. Pre-fabricated in a warehouse rented specifically for the works, the entire project was completed in 18 days over the xmas holidays of 2010/2011 allowing the facilities to re-open without a hitch for 2011 and providing essential improvements to the centre.